Clicky
Country

River erosion puts Boiarchar Bridge in Ramgati at risk


Published : 21 Jul 2025 08:15 PM

Boiarchar Bridge  in Ramgati of Lakshmipur is facing severe risk due to rapid erosion caused by the Meghna River near the local fish landing station. 

The riverbank erosion has led to significant damage to both returning walls of the bridge, with soil collapsing from underneath, forming large sinkholes. This poses a major threat to the Lakshmipur-Ramgati-Noakhali road, a vital transport route for thousands of daily commuters and goods vehicles.

Locals report that cracks have already begun to appear on the bridge structure, while erosion on the southern side near the market continues to worsen. Traders and residents are concerned that if the bridge collapses, it will not only disrupt daily travel but also severely impact the fish trade, agriculture, and local businesses that rely on this route. The damage could affect the livelihoods of thousands, including fishermen and farmers in the region.

Nahid, a local trader, described the situation as critical, stating that heavy vehicles are still crossing the bridge despite the growing sinkholes. The Meghna’s strong monsoon currents are intensifying the erosion, making collapse seem imminent. If the bridge fails, people may have to travel nearly 100 km via the Lakshmipur district headquarters to reach Noakhali – a significant increase in travel time and cost. Farmer Zomir Ali noted the presence of submerged shoals near the bridge. These shoals are disrupting the river’s natural flow, pushing the current toward the embankment and accelerating erosion.  Locals are urgently demanding river dredging, the use of geo-bags for reinforcement, and embankment repair to protect the road and nearby market.

Ramgati Upazila Nirbahi Officer (UNO) Syed Amjad Hosen confirmed that the river has indeed changed its course due to the shoals. The matter has been reported to the appropriate authorities. Water Development Board 

Executive Engineer Nahid Uz Zaman said emergency measures are being taken. 

The Local Government Engineering Department has also deployed an assistant engineer to inspect the site before taking 

further action.